Job bags, casting and setting tracked department by department on one floor board.

Who it is for
Manufacturers and factory managers who run their own production floor.
What it does
Factory / Job bags
Job bags by stage 16 Kartik 2083
- Open job bags
- 36 across 5 departments
- Gold in process
- 1,284.600 g fine
- Loss this week
- 0.42% against a 0.60% norm
| Stage | Bags | Gold in | Late |
|---|---|---|---|
| Casting | 8 | 412.300 g | 0 |
| Filing | 11 | 386.150 g | 1 |
| Setting | 9 | 301.780 g | 2 |
| Polishing | 8 | 184.370 g | 0 |
- 01
Floor board
See every job bag on the floor and where it sits in its route, with late jobs flagged.
- 02
Scan a bag at the gate
Scan a bag as it moves between departments so the board always matches the floor.
- 03
Casting flasks
Track casting flasks and their alloys, and see yield and loss against the norm.
- 04
Issue metal to the factory
Issue metal to the floor against job bags, with fine metal followed through each stage.
- 05
Diamond parcels and setters
Follow diamond parcels and packets handed to setters, with breakage audited.
- 06
Designs and routes
Define designs, departments, routes and casting alloys once, then reuse them on every job.
Key reports
- Daily ghat register
- Casting yield and loss
- Diamond setting and breakage audit
- WIP floor valuation
- Job bag cost register
- Stage throughput and lateness